Tech Support > Microsoft Windows > Windows CRM > Transfering data from demo installation to production installation
Transfering data from demo installation to production installation
Posted by Adam Pacholczuk on June 9th, 2005


I installed demo version of CRM Server and entered some data which I don't
want to lost. Now I have full version with new empty database. On SQL Server
there are two CRM databases: demo with my data and the new one. I thought
that it was possible to switch between those databases, unfotunately errors
occured. I tried switch the databases in Deployment Manager, and even
reinstall demo version with connection to existing database option. It seems
I've lost privilege to the demo database.
How can I retrive my data form demo database and tranfer it to a new
production database.